1. The result of this credit evaluation from the date of release to September 13, 2022,A -level 188bet188betconstruction enterprises can apply for bonus for railway construction projects that are bidded in accordance with regulations,Excessive bidding bidding chance automatically fails。
2. Above 2021、In the credit evaluation of the second half of the year,China Railway Three Innings、China Railway 4th inning、China Railway Seven Innings、China Railway 11th Bureau、China Railway Bridge Bureau、China Railway Beijing Engineering Bureau、7 188bet188betconstruction enterprises including 188bet sports betting188betChina Railway Shanghai Engineering Bureau are all rated as A -level,According to the provisions of the General Iron Construction [2018] No. 124,Add 1 chance to increase points each,From its own selection of bid sections before September 13, 2022。
Annex: 1. In the second half of 20121, the credit evaluation results of railway construction project construction projects (1)
2.Credit evaluation results of railway construction project construction projects in the second half of 2021 (2)
3. The credit 188bet188bet sports bettingevaluation results reported by the 188bet188betconstruction enterprises reported by each construction unit
4. Non -holding non -controlled railway project construction enterprise credit evaluation results
Ministry of Construction of the National Railway Group
March 14, 2022